Medical Waste High Temperature Steam Sterilization Processing Equipment for Contaminated PPE

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Specifications

Model:TR-HMT-3.2
Condition:New
Certification:ISO, CE
Automation:Automatic
Daily Capacity:≥ 3.2 T/D
Sterilization Temp:≥ 135°C
Working Pressure:≥ 0.22 MPa
Sterilization Time:≥ 45 Min
System Material:304 Stainless Steel
Drive Power:18.5 Kw X 2

System Overview & Core Process

⚙️

This Medical Waste High-Temperature Steam Sterilization System is a complete emergency disposal solution with a design capacity of 3.2 tons per day.

Loading & Sterilization: Waste is loaded into dedicated stainless-steel sterilization carts and automatically transferred into a horizontal cylindrical sterilizer (≥1700mm dia. x ≥4500mm length).

Medical Waste Sterilization Equipment
Steam Sterilization Process
🛡️

High-Temperature Treatment: The vessel operates at ≥0.22 MPa and ≥135°C for ≥45 minutes, utilizing pre-vacuum and post-vacuum cycles for effective air removal, sterilization, and drying.

Shredding & Disposal: Sterilized waste is automatically conveyed to a dual-shaft shredder (2x18.5KW) for irreversible size reduction, transforming it into ordinary municipal solid waste.

Key Features & Technical Compliance

Complete Line Configuration: Includes main sterilizer, automated cart transfer system, heavy-duty shredder, steam boiler, and wastewater/exhaust treatment systems.
Automated Safe Operation: Central PLC system provides fully automatic control with manual override, real-time monitoring, and safety interlocks.
Environmental Protection: Equipped with integrated exhaust gas treatment (scrubbing, UV, carbon adsorption) and wastewater treatment systems.

Operational Process Flow

  1. Feeding & Loading: Waste is loaded into dedicated carts.
  2. Sterilization Cycle: Pre-vacuum phase -> Steam injection (≥135°C, ≥0.22 MPa) -> Holding time (≥45 mins) -> Post-vacuum cooling.
  3. Unloading: Automated rail system transfers carts to discharge.
  4. Shredding: Dual-shaft shredder for complete volume reduction.
  5. Collection: Shredded residue is conveyed for final landfilling or disposal.

Technical Parameters

No. Project Item Technical Parameter
1ModelTR-MJG-3.2
2Processing Capacity≥3.2 T/D
3Main MaterialQ345R Steel (Anti-corrosion, ≥ 16mm)
4Sterilizer TypeCircular Horizontal Structure
5Diameter≥1700mm
6Length≥4500mm
7Furnace Doors2 (Rotary Swing Type)
8Control SystemAutomatic PLC with Manual Override

Related Medical Waste Equipment

Mobile microwave sterilization

Mobile microwave sterilization

Microwave medical waste treatment

Microwave medical waste treatment

Small microwave treatment

Small microwave treatment

High temperature chemical treatment

High temperature chemical treatment

Horizontal steam sterilization

Horizontal steam sterilization

Vertical steam treatment

Vertical steam treatment

Facility & Customer Case Studies

Facility Visit
Equipment Testing
Installation Site
Workshop
Manufacturing
Quality Control

Frequently Asked Questions

Q1: What is the daily processing capacity of the TR-HMT-3.2 system?

The system is designed for high-efficiency emergency disposal with a capacity of ≥ 3.2 tons per day, making it suitable for regional medical waste centers.

Q2: What temperature and pressure standards are used for sterilization?

The equipment operates at a temperature of ≥ 135°C and a pressure of ≥ 0.22 MPa for at least 45 minutes to ensure complete pathogen destruction.

Q3: How is the waste handled after the sterilization process?

Sterilized waste is automatically transferred to a dual-shaft shredder for irreversible size reduction, turning it into harmless municipal solid waste for landfilling.

Q4: Is the operation fully automated?

Yes, the system features a central PLC control unit that manages the entire cycle from loading to shredding automatically, though manual override is available for maintenance.

Q5: What environmental protection measures are integrated?

The system includes integrated exhaust gas treatment (using UV and carbon adsorption) and wastewater treatment to meet environmental emission standards.

Q6: What is the typical lead time for delivery?

For standard models, the delivery time typically ranges from 30 to 60 days depending on the specific configuration and customization requirements.

Related Products